Full bathroom renovation in Frogner, Oslo

The owner wanted a modern bathroom without moisture damage. We proposed full demolition, a new membrane and heating cables in a fixed three-week plan. The bathroom was handed over with documented wet-room work.

Step 1

A worn 1970s bathroom in a Frogner apartment was stripped back to the floor joists and rebuilt. We laid a new waterproof membrane on the floor and walls, cast the drain with a fall towards the floor gully and installed underfloor heating cables.

Step 2

Floors and walls are clad in large porcelain tiles, and the shower alcove has a recessed shelf and a glass screen. The basin, mirror and fittings were chosen to withstand daily use for many years.

Step 3

The job took three weeks for a bathroom of about six square metres. The plumber, electrician and tiler worked in a fixed order, so nobody had to wait for anyone else.